TIME-SCHEDULE AND DELIVERABLES

Activity 2010 2011
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Purchase of equipment
Modification / upgrade of existing infrastructure for enhanced mobility
Processing software (incl. Streamer position and depth information)
Acquisition software (Realtime positioning, geometry and coverage)
Navigation upgrade for R/V "Jan Mayen"
Engineering test cruise (UiT, UiB, PCable ASA) with new cross and tow cables, depth sensors on drop leads
All equipment available for full-scale survey
Commence full-scale surveying with G3 P-Cable infrastructure on national level
X X X X
X X X  

 

  X X
 

X X X
    X  
 

  X X
       
       

X X    
 

     
X X X  

X      

       
X      

X X X X
  X X